CONTRACTORS

deep custom systems for project-scale delivery

Built for

Fitout contractors, hospitality FM, and main-contractors delivering hotels, multi-unit residential, and commercial fitout.

What you get

Bespoke profiles, project-specific certificates, on-site install supervision, and matched accessories cut to your BOQ.

Why Contractors Choose SONSILL

15-30d

Typical production lead time

Why Contractors Choose SONSILL

Project-grade quality: Wall panels, accessories, and installation guidance are aligned before production.

Complete system supply: WPC, PVC shower walls, acoustic panels, flooring, and matching trims can be planned together.

Schedule support: Samples, certificates, production photos, and loading plans help reduce site-delay risk.

Technical support: Send drawings or BOQs on WhatsApp for material selection and specification review.

48h

Drawing review response

85%

Installation labor saving target

Project-Grade Engineering

Four reasons fitout contractors and main-contractors choose SONSILL over generic catalog suppliers.

  • Bespoke profiles

    Section, color, finish, surface — engineered to your tender drawings, not stock catalog only.

  • Cert pack on demand

    ASTM, EN, BS, ISO references aligned to your jurisdiction and project specification.

  • On-site supervision

    Remote and on-site install supervision — included for projects above 2,000 m².

  • 10-year structural

    Project-grade warranty on outdoor cladding and acoustic systems, backed by exporter.

Stock catalog supplier

SONSILL project channel

2,000 m²

Supervision threshold

10 yrs

Structural warranty

Project Cases by Application

Reference use cases for hotel bathrooms, offices, shopping malls, apartments, and other commercial interiors where delivery speed and finish consistency matter.

Hotel Project

Indonesia

Office Building

UAE

Shopping Mall

Canada

Apartment Project

Australia

Drawings first. Samples next. Production after confirmation.

SONSILL wall panel measurement before contractor project supply

Contractor support

Send dimensions, color direction, and site use. We align sample, profile, and document pack before production.

Submit drawings on WhatsApp

Engineering review

Shop drawings reviewed by SONSILL engineering — profile, fixing, expansion, finish.

Certificate pack

ASTM, EN, BS, ISO documents aligned to your tender — issued in your name and project.

Install supervision

Remote video supervision plus on-site visit for projects above 2,000 m². Reduces rework risk.

Project warranty

Up to 10-year structural warranty on outdoor cladding, 5-year on interior, written on exporter letterhead.

Systems

PVC shower walls, exterior WPC cladding, acoustic ceilings, hospitality wet-area kits — full system engineering, not just panels.

PVC and WPC wall panel system specification support
Project flow

From Tender Drawings to Site Sign-Off

The full project delivery loop — engineering, certification, production, install supervision, sign-off.

01

Step 01

Submit drawings

Send tender drawings, BOQ, and certificate requirements. Engineering responds in 48h.

Day 1-2

02

Step 02

Engineering review

Profile, fixing detail, finish, expansion — confirmed and BOM finalized.

Day 3-7

03

Step 03

Sample & cert

Bespoke sample dispatched, project-specific certificate pack issued.

Day 8-14

04

Step 04

Production

Bespoke run scheduled, mid-production photos sent, FCL ETA confirmed.

Day 15-35

05

Step 05

Install supervision

Remote daily video supervision; on-site engineer for projects above 2,000 m².

Day 36-60

06

Step 06

Sign-off

Joint walk-through, defects list, warranty document issued.

Day 61+

Next step

Send your project brief to SONSILL.

Share drawings, quantities, market, and timeline. We will confirm samples, specs, and matched accessories.

Samples

Project sample pack

Exact section, color, and finish for tender or site review.

Request samples

Documents

Spec and certificate support

Confirm product series and market to match available files.

Contact project desk